A stake-driving ceremony for construction of school building at Basic Education High School (Branch) in the town of Momauk, Bhamo District, Kachin State was held this morning.
The construction of Thanlyin Bridge-3 connecting between Thanlyin and Thakayta townships in Yangon Region and crossing the Bago River is about 83 per cent complete on Thakayta side (Package-3), and the construction works in the remaining Package 1 and 2 are being carried out.