New Dokhtawady Bridge to feature Myanmar’s first EradiQuake bearings

THE new Dokhtawady Bridge, being construct­ed at Milepost 358/1 on the Yangon-Mandalay Expressway, will be fitted with earthquake-resistant EradiQuake bearings the approach bridge with high damping rubber bearings (HDRB) – the first instal­lation of its kind in Myan­mar – and is scheduled for completion before the end of 2026, according to the Ministry of Construction.

 

The bridge is being built using a steel box girder and prestressed concrete deck system. It has been designed and cal­culated in compliance with earthquake-resistance standards set out in the Myanmar National Build­ing Code 2025, the ministry said. — ASH/KNN