Ongoing renovation work in Falam, Chin State

WHILE construction work is underway in Falam Township, renovation work is being carried out on the RC three-storey building of the Deputy Director’s Office of the District High­ways Department, two new housing units for the High­ways Department and the three-storey office building of the Urban and Housing Development Department.

 

Deputy Minister for Construction Dr Thaung Naing, who is in Chin State to oversee rehabilitation work, inspected the reno­vation works together with Chin State Minister for Electricity, Energy, Indus­try and Transport U Nay Lin Aung and members of the Chin State Rehabilita­tion and Reconstruction Committee yesterday morning.

 

During the inspec­tion, the deputy minister instructed officials to repair the departmental buildings systematically so that office operations could resume and public services could be provid­ed upon completion. He also called for the work to be expedited to ensure that the offices could re­sume operations as soon as possible.

 

Afterwards, the depu­ty minister inspected the renovation of the former Road Management Cen­tre and the opening of a temporary office. He also inspected the three-sto­rey staff housing of the Department of Urban and Housing Development and gave instructions to ensure that departmen­tal staff and their families working in Falam could live with peace of mind. He also instructed offi­cials to make proper use of salvaged materials, dispose of construction waste properly, clean the work areas and arrange drainage channels to im­prove water flow. — Dis­trict IPRD/MKKS