REPAIR works are currently underway in Falam on a two-storey, six-unit staff housing building at Falam People’s Hospital; a two-storey RC building with eight units for nurses; a two-storey RC building with four units for doctors; and the one-storey RC convocation hall, trainees’ dormitory, classroom building and principal’s office of Falam Nursing Science School.
Deputy Minister for Construction Dr Thaung Naing, who is in Chin State to oversee rehabilitation works, inspected the ongoing repairs yesterday morning together with Chin State Minister for Electricity, Energy, Industry and Transportation U Nay Lin Aung and members of the state’s rehabilitation and reconstruction committee.
The deputy minister instructed officials to expedite the repair works so that the buildings can be put back into use and nursing training courses can resume at the earliest possible time.
The hospital superintendent also explained plans to temporarily convert a two-storey, six-unit staff housing building into a temporary hospital. The deputy minister instructed the officials to complete the work systematically within the set timeframe and ensure that essential health services can resume immediately upon completion. He also urged relevant departments to conduct thorough inspections and formally take over the renovated facilities.
The medicines and medical supplies for Tiddim and Tonzang People’s hospitals arrived in Tiddim on Tuesday evening. A 100 MA fixed-type digital X-ray machine for the Tiddim People’s Hospital (100- bed) has also been installed and prepared for use. The medicines and medical supplies will subsequently be transported from Tiddim to Tonzang. — District IPRD/KTZH


