THE natural gas was tested and recovered from 5,900 feet of sand at oil field 15 in Maubin (South), resulting in a daily increase of two million cubic feet.
Similarly, work is underway to find more sand layers in oil fields 17 and 19 to increase gas production.
The Ministry of Electricity and Energy is exploring, measuring and inspecting the amount of oil that can be extracted, drilling and producing in approved areas, and renovating old wells in order to increase the production of natural gas needed for power generation, industrial enterprises, and transportation. In addition, it is conducting research and using technology to expand sand seams as well as extraction operations from thin sand layers are ongoing.
New well drilling operations are also underway in oil fields in Ayeyawady and Yangon regions, and the natural gas produced will be distributed to factories that have increased demand. — MNA/MKKS


