Shwe Kokko Phase II demolition continues

TREATING the fight against telecom fraud and online gambling as a matter of national duty, the Government is systematically demolish­ing illegal structures in the Shwe Kokko area to prevent them from be­ing reused for scam and gambling operations.

 

As part of operations targeting the remaining illegal buildings in Shwe Kokko Phase II, heavy machinery has been de­ployed to dismantle key structures. Demolition of a five-storey building is 75 per cent complete, while work on a six-sto­rey building is 20 per cent complete.

 

Of the 63 buildings designated for demolition in Phase II of the Shwe Kokko area, ten have been demolished, including four through controlled explosions and six using heavy machinery. The re­maining 53 buildings will also be systematically de­molished. — 100/MKKS